businesspress24.com - Endeavour Silver Produces 596,545 oz Silver and 5,817 oz Gold in Abbreviated Second Quarter, 2020
 

Endeavour Silver Produces 596,545 oz Silver and 5,817 oz Gold in Abbreviated Second Quarter, 2020

ID: 1559364

(PresseBox) - Endeavour Silver Corp. (NYSE: EXK) (TSX: EDR) https://www.commodity-tv.com/ondemand/companies/profil/endeavour-silver-corp/ reports production of 596,545 silver ounces (oz) and 5,817 gold oz in Q2, 2020, for silver equivalent (?AgEq?) production of 1.06 million oz at an 80:1 silver:gold ratio (1.18 million oz at 100:1 ratio).

During the quarter, mining operations were suspended on April 1st as mandated by the Mexican government to halt the spread of the COVID-19 pandemic.

Endeavour had the advantage of having already put in place a rigorous coronavirus prevention and response plan and having built up ore stockpiles at each mine site.

Therefore, Q2 plant throughput was only down 52% and silver equivalent production was down only 42% compared to Q2, 2019.

2020 Second Quarter Highlights

Mines Successfully Re-Started:

Guanacevi Continued to Outperform: Processed tonnes, silver and gold grades and recoveries continued to deliver well above plan. The operational turn-around and transition to mining the new, higher grade El Curso, Milache and SCS orebodies had a significant positive impact on the re-start. Ore stockpiles and pre-prepared long hole stopes allowed for an expedited restart, while the testing of the newly installed cone crushers in April allowed for significant plant throughput in May.

Bolanitos and El Compas Steady: Bolanitos and El Compas re-starts were slower than Guanacevi due to smaller stockpiles and greater focus on mine development and grade control during the ramp up period. Gold grades exceeded historical grades in June, while silver grades remained low due to variations in the ore bodies.

Metal Sales and Inventories: Sold 634,839 oz silver and 5,218 oz gold, held 221,100 oz silver and 738 oz gold of bullion inventory and 14,000 oz silver and 1,215 oz gold in concentrate inventory.





Positive Bolanitos Drill Results: Drilling intersected new high-grade gold-silver mineralization in the Melladito vein near the Bolanitos plant with assays up to 24.3 grams per tonne (gpt) gold and 787 gpt silver for 3,217 gpt silver equivalents (AgEq) at a 100:1 silver:gold ratio over a 1.5 meter (m) true width in hole BN27.

Positive Guanacevi Drill Results: Drilling in Q1, 2020 intersected new high-grade gold-silver mineralization in the Santa Cruz vein on the El Curso property with assays up to 1,085 gpt silver and 3.25 gpt gold for 1,410 gpt AgEq over 10.0 m true width in hole UCM-27.

Released 2019 Sustainability Report: The Company released its 8th consecutive Sustainability Report at https://csr.edrsilver.com outlining its sustainability initiatives and results for 2019.

Launched At-The-Market Financing: The Company entered into a sales agreement with a syndicate of banks to sell up to $23 million worth of common shares to advance the Terronera project and provide working capital during these uncertain global economic conditions.

Bradford Cooke, Endeavour CEO, commented, ?I am pleased to report that notwithstanding the challenges of the COVID-19 pandemic, Endeavour personnel were pro-active in minimizing its impact on our mining operations in Mexico.

?During the mine suspension period, we sent our employees home on full salary while keeping essential personnel working at each mine site to maintain safety, security and equipment. After the mines restarted, we were able to outperform our adjusted mine plans in June.

Mine Operations

Consolidated silver and gold production in Q2, 2020 were both lower than Q2, 2019 due to the suspension of the Guanacevi, Bolanitos and El Compas mines as a result of the COVID-19 pandemic and the suspension of the El Cubo mine, related to lack of ore in November 2019. Ignoring El Cubo, Q2, 2020 production, pro-rated for the number of operating days, increased significantly due to the improved plant throughput and ore grades at Guanacevi

Guanacevi silver and gold grades were higher than Q2, 2019 and well above plan, while silver recoveries were lower and gold recoveries were higher than Q2, 2019.to 1150 tpd in H2, 2020.

Bolanitos gold grades were higher and silver grades were lower than Q2, 2019 and approached planned grades.scovery.

El Compas gold grades were higher and silver grades were lower than Q2, 2019, above and below planned grades respectively.l mining to employee long hole mining should be completed in H2, 2020.

Release of Second Quarter, 2020 Financial Results and Conference Call

The 2020 First Quarter Financial Results will be released before market on Thursday, August 6, 2020 and a telephone conference call will be held the same day at 10:00am PT (1:00pm ET). To participate in the conference call, please dial the numbers below. No pass code is necessary.

Toll-free in Canada and the US: 1-800-319-4610

Local Vancouver: 604-638-5340

Outside of Canada and the US: +604-638-5340

A replay of the conference call will be available by dialing 1-800-319-6413 in Canada and the US (toll-free) or +604-638-9010 outside of Canada and the US. The required pass code is 4879#. The audio replay and a written transcript will be available on the Company''s website at www.edrsilver.com under the Investor Relations, Events section.

About Endeavour Silver

Endeavour Silver Corp. is a mid-tier precious metals mining company that owns and operates three high-grade, underground, silver-gold mines in Mexico. Endeavour is currently advancing the Terronera mine project towards a development decision and exploring its portfolio of exploration and development projects in Mexico and Chile to facilitate its goal to become a premier senior silver producer.

Cautionary Note Regarding Forward-Looking Statements

This news release contains ?forward-looking statements? within the meaning of the United States private securities litigation reform act of 1995 and ?forward-looking information? within the meaning of applicable Canadian securities legislation. Such forward?looking statements and information herein include but are not limited to statements regarding the impact of suspension of mining operations, Endeavour?s anticipated performance in 2020, including production forecasts, cost estimates and metal price estimates, and the timing and results of mine expansion and development and receipt of various permits. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include, among others, uncertainty of the ultimate impact of the COVID 19 pandemic on operations, changes in national and local governments, legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining; metal prices; the speculative nature of mineral exploration and development, risks in obtaining necessary licenses and permits, and challenges to the Company?s title to properties; as well as those factors described in the section ?risk factors? contained in the Company?s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company?s mining operations ,the impact of the COVID 19 pandemic on mining operations in Mexico generally, and the Company?s operations specifically, no material adverse change in the market price of commodities, mining operations will operate and the mining products will be completed in accordance with management?s expectations and achieve their stated production outcomes, resource and reserve estimates, metal prices, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:



Leseranfragen:



PresseKontakt / Agentur:



drucken  als PDF  an Freund senden  Vizsla Announces C$25 Million Bought Deal Private Placement
Meyer Burger announces details of its planned capital increase
Bereitgestellt von Benutzer: PresseBox
Datum: 09.07.2020 - 10:18 Uhr
Sprache: Deutsch
News-ID 1559364
Anzahl Zeichen: 2645

contact information:
Contact person:
Town:

Vancouver, British Columbia


Phone:

Kategorie:

Internet


Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:


Diese Pressemitteilung wurde bisher 531 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Endeavour Silver Produces 596,545 oz Silver and 5,817 oz Gold in Abbreviated Second Quarter, 2020
"
steht unter der journalistisch-redaktionellen Verantwortung von

Swiss Resource Capital AG (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).

Silver now in the league of critical metals ...

Since 2017, the US has had a list of critical minerals, and according to the US Geological Survey, silver is now included. - Advertisement/Advertising - This article appears on behalf of Skeena Gold & Silver Ltd. and Endeavour Silver Corp., compa ...

New potash capacities are in demand ...

Potash is used worldwide for fertilizer production. Cultivated land is decreasing, while the world population is growing. Advertisement/Advertising - This article appears on behalf of Millennial Potash Corp., with which SRC swiss resource capital AG ...

Gold, platinum, and copper ...

These three precious metals have similarities, but there are also differences. Advertisement/Advertising - This article appears on behalf of Mogotes Metals Inc. and Sibanye-Stillwater Limited, with which SRC swiss resource capital AG has paid IR advi ...

Alle Meldungen von Swiss Resource Capital AG



 

Who is online

All members: 10 565
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 75


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.