Zinc One Files National Instrument 43-101 Technical Report for Resource Estimate at Bongará Zinc Mine Project, Peru
(PresseBox) - Zinc One Resources Inc. (TSX-V: Z; OTC Markets: ZZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? http://www.commodity-tv.net/c/search_adv/?v=298394) announces that it has filed on SEDAR the
On February 5, 2019, the Company reported an Indicated Mineral Resource of 812,000 tonnes averaging 18.9% Zn containing 339,000,000 pounds of Zn at a 10% Zn cut-off and an Inferred Mineral Resource of 1,339,000 tonnes averaging 16.8% Zn containing 496,000,000 pounds of Zn at a 10% Zn cut-off.
The Bongarralization. This provides an exciting opportunity to discover zinc-rich deposits in future exploration campaigns.
The zinc mineralization at the Bongar
The former Bongarluding a permanent tailings storage facility and minimizing initial and sustaining capital outlays.
Qualified Persons
The technical content of this news release has been reviewed, verified and approved by Al Workman, P.Geo., senior geologist and Vice-President of WGM and John Reddick, senior WGM Associate resource modelling engineer, both Qualified Persons under National Instrument 43-101.
About Zinc One Resources Inc.
Zinc One?s key assets are the Bongar>20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte-Bongar
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Datum: 20.03.2019 - 02:20 Uhr
Sprache: Deutsch
News-ID 1547799
Anzahl Zeichen: 3859
contact information:
Contact person:
Town:
Vancouver, B.C.
Phone:
Kategorie:
Internet
Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:
Diese Pressemitteilung wurde bisher 654 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Zinc One Files National Instrument 43-101 Technical Report for Resource Estimate at Bongará Zinc Mine Project, Peru
"
steht unter der journalistisch-redaktionellen Verantwortung von
Swiss Resource Capital AG (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).




