Zinc One Reports Additional High-Grade Drill Results At Mina Grande Sur, Bongará Zinc Mine Project, Peru
20.5 Metres of 34.3% Zinc and 8.2 Metres at 42.7%
(PresseBox) - Zinc One Resources Inc. (TSX-V: Z; OTC Markets: ZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? - https://www.youtube.com/watch?v=4D9jgUm6sGA&t=71s ) is pleased to announce additional drill results from the Mina Grande Sur zone at its Bongar
Jim Walchuck, President and CEO of Zinc One commented, ?While this portion of the Mina Grande Sur drill program was designed to determine the extent of the mineralization, we have been pleasantly surprised to obtain these additional high-grade intersections.
Mina Grande Sur Drill Results Highlights:
Results from 11 holes were reported previously (see news release from March 29, 2018)
Significant new intercepts include:
[list]
MGS18016 ? 4.7 metres of 26.1% zinc, from surface
MGS18017 ? 8.2 metres of 42.7% zinc, from 7.5 metres drill depth
[list]
True vertical thickness of 5.8 metres from true vertical depth of 5.3 metres
MCH18020 ? 20.5 metres of 34.3% zinc, from surface
True vertical thickness of 14.5 metres
Mineralization at Mina Grande Sur includes zinc oxides, carbonates and silicates hosted by soils, highly-weathered carbonates, and fine- to coarse-grained dolomites.
[/list]
[/list]
Mina Grande Sur is one of three known zones of high-grade, near-surface zinc-oxide mineralization along a 1.4 kilometre mineralized trend that is being tested by this drill program.
Geology and Discussion of Results
The zinc mineralization at Bongaration is not known, the intercepts do not necessarily represent true thicknesses; moreover, long intercepts, e.g., MGS18-003, most likely drilled subparallel to the dip of the tabular mineralized body.
Sampling and Analytical Protocols
Zinc One follows a systematic and rigorous Quality Control/Quality Assurance program overseen by Dr. Bill Williams, COO and Director of Zinc One.
The sample from each core run is placed in a 60-centimetre long, plastic core box that has five columns.<2 metres, are chosen. Each core box is photographed and then sampled with a spatula (soil and heavily-weathered rock) or cut with a core saw, 50% of which is placed in a sample bag and stored on site in a secure location. The Company independently inserts certified control standards, blanks, and duplicates, all of which comprise at least 20% of the sample batch, to monitor sample preparation and analytical quality.
Qualified Person
The technical content of this news release has been reviewed, verified and approved by Dr. Bill Williams, COO and Director of Zinc One, a qualified person as defined by NI 43-101.
About Zinc One Resources Inc.
Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions.n included >20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte Bongar
Additional Information
Monica Hamm
VP, Investor Relations
Zinc One Resources Inc.
Phone: (604) 683-0911
Email: mhamm(at)zincone.com
www.zincone.com
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Datum: 09.05.2018 - 04:24 Uhr
Sprache: Deutsch
News-ID 1535784
Anzahl Zeichen: 7955
contact information:
Contact person:
Town:
Vancouver, BC
Phone:
Kategorie:
Internet
Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:
Diese Pressemitteilung wurde bisher 699 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Zinc One Reports Additional High-Grade Drill Results At Mina Grande Sur, Bongará Zinc Mine Project, Peru
"
steht unter der journalistisch-redaktionellen Verantwortung von
Swiss Resource Capital AG (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).