Second Drill Rig Mobilized at Zinc One''s Bongará Mine Project, Peru
Future Exploration Strategy Outlined
(PresseBox) - Zinc One Resources Inc. (TSX-V: Z; OTC Markets: ZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? - https://www.youtube.com/watch?v=4D9jgUm6sGA&t=4s ) is pleased to provide an update on the current drill program at its Bongar
Two portable drill rigs operated by Energold Drilling Group are currently on site.
Jim Walchuck, President and CEO of Zinc One commented, ?The drill program is proceeding as planned and we expect the initial results from the lab towards the end of Q1 2018.
*Related news releases are from November 1, 2017, December 19, 2017, January 25, 2018 and February 21, 2018.
Future Drilling Planned
Within the next 30 days, the Company plans to file a new permit application to drill approximately an additional 400 platforms in areas surrounding the current drill program.
In addition, the Company is considering a program comprised of 40 drill platforms at Campo Cielo, which has promising exploration upside due to its proximity to Bongarita.
Geology and Discussion of Results
The zinc mineralization at Bongar
Qualified Person
The technical content of this news release has been reviewed, verified and approved by Dr. Bill Williams, COO and Director of Zinc One, a qualified person as defined by National Instrument 43-101.
About Zinc One Resources Inc.
Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions.n included >20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte Bongar
Additional Information
Monica Hamm
VP, Investor Relations
Zinc One Resources Inc.
Phone: (604) 683-0911
Email: mhamm(at)zincone.com
www.zincone.com
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Datum: 08.03.2018 - 03:00 Uhr
Sprache: Deutsch
News-ID 1533484
Anzahl Zeichen: 7023
contact information:
Contact person:
Town:
Vancouver, BC
Phone:
Kategorie:
Lifestyle & Leisure
Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:
Diese Pressemitteilung wurde bisher 1050 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Second Drill Rig Mobilized at Zinc One''s Bongará Mine Project, Peru
"
steht unter der journalistisch-redaktionellen Verantwortung von
Swiss Resource Capital AG (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).




