New order for the impressive “Makkah Clock Royal Tower”
Just recently Lindner offers an appealing solution for plasterboard ceilings to guarantee an ideal illumination of every room. The innovative LED lamp module is architecturally and flush integrated in the ceiling panel.
(firmenpresse) - The new integrated luminaire is both adapted for metal ceilings and as inspection hatch in plasterboard ceilings and offers thereby an easy access to the ceiling void for maintenance and installation works.
The renowned lighting laboratory Bartenbach LichtLabor designed the used and awarded lighting technology for normal reversible ceilings. The further development to the modern LED technology, especially used for plasterboard ceilings, was performed in cooperation with the Lindner Group.
Thus it could be attained an order for the 601 meter high „Abraj-Al-Bait-Tower“ in Mecca (Saudi Arabia). The newly developed product by Lindner will be installed in an astronomy exhibition of the tower at a height of 425 meter. A homogenous brightness control in the secondary rooms of the museum can be achieved with the well illuminated lighting system.
The complete fusion of architecture and light combined with minimal dimensions of installation and a luminaire that fades into the background, is the uniqueness of this integrated luminaire. Perfect illumination, due to a patented lens system and the minimum opening for light emission, eliminates mental stress by means of disturbing reflexion as well as glare of light pressure.
For corridors or work areas, the luminaire with 5-rowed illuminating module is perfectly suitable. Furthermore, the perfect integration in the ceiling area enables a fast access to the ceiling void and facilitates maintenance works.
Project partners:
•Bartenbach LichtLabor GmbH (www.bartenbach.com)
•Digital Elektronik GmbH (www.digital-elektronik.com)
•SL Rasch GmbH Special and Lightweight Structures (www.sl-rasch.de)
Consequently, the Lower Bavarian company, whose strengths are amongst others holistic solutions from one source and a flush integration of luminaires in metal ceilings, offers as well premium lighting solutions for plasterboard ceilings.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Lindner – Building new solutions
The Lindner Group is Europe’s leading company for interior fit-out, facade construction and insulation engineering.
Operating from the Bavarian city of Arnstorf, where the company was founded in 1965, we elaborate customised package solutions for our clients by offering them our unequalled range of services “Concepts-Products-Services”.
Lindner, a responsible and innovative family-owned business, highly values sustainable development. Their future-oriented energy management and environmental protection not only on paper is what makes our building and production sites from all over the world truly stand out.
Datum: 18.09.2012 - 03:08 Uhr
Sprache: Deutsch
News-ID 1151791
Anzahl Zeichen: 0
contact information:
Contact person: Wolfram Aichner
Town:
Arnstorf
Phone: +49 (0)8723/20-0
Kategorie:
Electronics & Semiconductors
Anmerkungen:
Diese Pressemitteilung wurde bisher 481 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"New order for the impressive “Makkah Clock Royal Tower”
"
steht unter der journalistisch-redaktionellen Verantwortung von
Lindner Group (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).