Gatling Expands Drill Program to 20,000 meters at Larder Gold Project

ID: 1551378
recent pressrelease next pressrelease

(businesspress24) - Vancouver, British Columbia, August 13, 2019 - GATLING EXPLORATION INC. (TSXV: GTR, OTC: GATGF) (the Company or Gatling) is pleased to announce that, due to the success of the initial 10,000 meters of drilling, it is expanding the 2019 program to 20,000 meters. The additional drill meters will continue to focus on expanding the Bear, Cheminis and Fernland deposits, as well exploring the recently permitted Kir Vit property.

Exploration Drill Program Highlights
- Additional 10,000 meters to focus on deposit expansion and new, high-grade targets. Gatling has extended the program to 20,000 meters with the aim of expanding mineralized horizons at Bear, Cheminis and Fernland and also exploring new intrusion-related mineralization at the Kir Vit property.
- Exceptional Hit Rate. The first six holes drilled at the Bear deposit all intersected gold mineralization. The holes confirmed historical high-grade lenses, tested down plunge continuity and extended the mineralized zones to the west towards the Cheminis deposit. Gatling has completed 13 drill holes to date with 7 holes drilled at Bear and Cheminis deposits with assays pending.
- Mineralized Trend with 4 km of Strike. Gatling considers the Fernland, Cheminis and Bear deposits to be part of one large mineralized system with a strike length of 4 km along the Cadillac-Larder Break with small displacements within each deposit. The recent results demonstrate that the Bear Deposit has strong continuity along strike over 500 meters and with a depth component over 700 meters within the North Carbonate Gold (North) zone (Figure 2).
- Two Rigs, Ongoing Drilling. Two rigs are currently drilling at the Larder Gold Project with one rig exploring the Bear and Cheminis deposits and the second rig exploring the Kir Vit zone (Figures 1, 3 & 4).

Summary of 2019 Completed Drill Holes to Date
Drill Hole Locations
Hole ID AzimutDip Length UTM UTM Elev (m
h (m) East North )



Assays Received
GTR-19-001A171 -67 1,047 600900 5330950 327
GTR-19-002 171 -67 996 600953 5330933 327
GTR-19-003 171 -67 1,011 600791 5330931 319
GTR-19-004W171 -50 447 600791 5330931 319
GTR-19-005W180 -67 652 600791 5330931 319
2

GTR-19-006A174 -65 921 600794 5330920 320
Assays Pending
GTR-19-007A170 -75 1509 601007 5331166 318
GTR-19-008 315 -77 369 599330 5330194 320
GTR-19-009 180 -67 1070 600750 5330946 329
GTR-19-010 315 -77 381 599408 5330255 330
GTR-19-011 325.6 -72 309 599505 5330297 330
GTR-19-012 330 -72 339 599598 5330326 324
GTR-19-013 180 -66 642 599674 5330483 328
Results from 2019 Drill Holes
Hole ID From (mTo (m)Length (Au (g/tZone
) m) )



GTR-19-001A815.0 820.0 5.0 1.0 North
Including 816.0 817.0 1.0 1.9 North
and 818.0 819.0 1.0 1.4 North
Including

890.0 891.0 1.0 3.4 Ultramafics
933.5 934.5 1.0 2.3 South Flow

GTR-19-002 825.0 830.0 5.0 1.3 North /Ultramafi
cs

Including 826.4 827.0 0.6 5.9 North /Ultramafi
cs

846.0 847.0 1.0 2.2 Ultramafics
851.0 852.0 1.0 2.9 Ultramafics
925.0 927.0 2.0 0.6 South Flow

GTR-19-003 797.0 803.1 6.1 20.7 North
/Graphitic
Zone

808.0 815.0 7.8 6.6 North
/Graphitic
Zone

821.0 822.0 1.0 3.2 Ultramafics
967.2 968.8 1.6 1.9 South Flow

GTR-19-004W782.0 790.0 8.0 10.8 North
919.0 920.0 1.0 1.2 South Flow

GTR-19-005W788.0 793.0 5.0 12.7 North
2

810.1 815.0 4.9 2.5 Ultramafics
917.0 918.0 1.0 1.0 South Flow

GTR-19-006A750.5 753.5 3.0 9.7 North
770.6 772.0 1.4 1.3 Ultramafics
871.0 875.0 4.0 8.5 Altered South
Flow

879.0 882.0 3.0 1.2 South Flow

Nathan Tribble, Vice President Exploration stated, The goal of our initial 10,000 m program at the Larder Gold Project was to confirm historical high-grade lenses and expand the footprint of the existing deposits. We are very pleased with our success so far and have doubled the program to a total of 20,000 m. The expanded program will also include drill testing a number of attractive high-grade gold targets on our newly acquired Kir Vit property.

https://www.irw-press.at/prcom/images/messages/2019/48558/2019-08-13 GTR NR Gatling Expands Drill Program to 20K_PRCOM.001.jpeg

Figure 1. Larder Project long section hybrid long section looking north with drilling composites

https://www.irw-press.at/prcom/images/messages/2019/48558/2019-08-13 GTR NR Gatling Expands Drill Program to 20K_PRCOM.002.jpeg

Figure 2. Bear Deposit hybrid long section looking north with drilling composites.

https://www.irw-press.at/prcom/images/messages/2019/48558/2019-08-13 GTR NR Gatling Expands Drill Program to 20K_PRCOM.003.jpeg

Figure 3. Larder Gold Project surface drilling status map showing local geology.

https://www.irw-press.at/prcom/images/messages/2019/48558/2019-08-13 GTR NR Gatling Expands Drill Program to 20K_PRCOM.004.jpeg

Figure 4. Kir Vit property surface drilling status map showing local geology.


QA/QC

Drill core is logged and sampled at the Larder project site. Core samples from the program are cut in half, using a diamond cutting saw with half sent for assay at ActLabs in Timmins, Ontario. The other half is secured and retained on site. All samples are analyzed for gold using standard Fire Assay-AA techniques. Samples returning greater than 5.0 g/t gold are analyzed utilizing standard Fire Assay-Gravimetric methods. Certified reference standards and blanks are routinely inserted into the sample stream as part of Gatlings quality control/quality assurance program.

About Gatling Exploration

Gatling Exploration is a Canadian gold exploration company focused on advancing the Larder Gold Project, located in the prolific Abitibi greenstone belt in Northern Ontario. The Larder property hosts three high-grade gold deposits along the Cadillac-Larder Lake Break, 35 km east of Kirkland Lake. The project is 100% controlled by Gatling and is comprised of patented and unpatented claims, leases and mining licenses of occupation within the McVittie and McGarry Townships. The 3,370-hectare project area is positioned 7 km west of the Kerr Addison Mine, which produced 11 million ounces of gold. All parts of the Larder property are accessible by truck or all-terrain vehicles on non-serviced roads and trails.

Qualified Person

The technical content of this news release has been reviewed and approved by Nathan Tribble, P. Geo., Vice President Exploration of Gatling Exploration and a Qualified Person pursuant to National Instrument 43-101.

ON BEHALF OF THE BOARD OF DIRECTORS,

Nav Dhaliwal, President and CEO
Gatling Exploration Inc.


For further information on Gatling, contact Investor Relations
Telephone: 1-888-316-1050
Email: ir(at)gatlingexploration.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements: Statements contained in this news release that are not historical facts are forward-looking statements, which are subject to a number of known and unknown risks, uncertainness and other factors that may cause the actual results to differ materially from those anticipated in our forward-looking statements. Although we believe that the expectations in our forward-looking statements are reasonable, actual results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.



More information:
http://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:





PressContact / Agency:



published by: irw
print pressrelease  send to a friend  

Date: 08/13/2019 - 08:23
Language: English
News-ID 1551378
Character count: 8971
Kontakt-Informationen:
Firma: Gatling Exploration
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Wien
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 173

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 338
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 49


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.