Piedmont Lithium Limited: Juni 2019 Quarterly Report
(firmenpresse) - 
Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLL) (Piedmont or Company) is pleased to present its June 2019 quarterly report. Highlights during and subsequent to the quarter were:
- Increased total Mineral Resources for the Piedmont Lithium Project (Project) by 72% to 27.9 million tonnes (Mt) at a grade of 1.11% Li2O following:
- an updated Mineral Resource estimate for the Companys Core property, increasing the Core property Mineral Resources to 25.1 Mt at a grade of 1.09% Li2O; and
- an initial Mineral Resource estimate for the Companys Central property, located approximately one mile south of the Core property, of 2.8 Mt at a grade of 1.34% Li2O.
- Completed mineralogical analysis on samples of mineralized pegmatites and composite samples from the Project demonstrating that lithium occurs almost exclusively within spodumene in the Projects ore body.
- Completed PFS-level metallurgical test work demonstrating high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from representative bulk samples using a combination of Dense Medium Separation (DMS) and flotation technology.
- Continued the 25,000-meter Phase 4 drill program, where a total of 94 holes have been completed to date for a total of 15,738 meters.
- Substantially completed engineering for the planned Scoping Study update to integrate updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs. 
- Continued numerous preliminary off-take, financing and strategic conversations, including companies from the lithium, mining, chemicals, battery, automotive and private equity sectors.
- After quarter end, on July 10th, Piedmont completed an institutional placement of 145 million shares at A$0.145 per share to raise gross proceeds of A$21 million, led by cornerstone investor, Fidelity International (Fidelity) and the Companys largest shareholder, AustralianSuper.
Next steps:
- Complete an updated Scoping Study based on updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs.
- Continue Phase 4 drilling and expansion of the Companys land position in the Carolina Tin-Spodumene Belt (TSB) with a focus on areas of high mineral prospectivity.
- Complete permit applications and secure the necessary permits and approvals to commence mining and processing operations at the Project.
- Advance development of the Companys proposed lithium hydroxide chemical plant including metallurgical testwork for the conversion of spodumene concentrate produced from Piedmont ore.
For further information, contact:
Keith D. Phillips --- 
President & CEO --- 
T: +1 973 809 0505 ---
E: keith(at)piedmontlithium.com -
Anastasios (Taso) Arima 
Executive Director
T: +1 347 899 1522
E: taso(at)piedmontlithium.com
Project Overview
Piedmont Lithium Limited (ASX: PLL; Nasdaq: PLL) holds a 100% interest in the Piedmont Lithium Project (Project) located within the TSB and along trend to the Hallman Beam and Kings Mountain mines, which historically provided most of the western worlds lithium between the 1950s and the 1980s. The TSB has been described as one of the largest lithium regions in the world and is located approximately 25 miles west of Charlotte, North Carolina.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.001.jpeg
Figure 1: Piedmont Lithium Project located within the TSB
In September 2018 the Company published a Scoping Study for an integrated lithium hydroxide business, which featured a 13-year project life, NPV8 of US$888 million, a US$3,112 per tonne lithium hydroxide operating cost, and a US$193 per tonne spodumene concentrate operating cost.
The Company expects to publish an updated Scoping Study within the next 2 weeks based on the expanded Mineral Resource estimate of 27.9 Mt grading at 1.11% Li2O. As a result of the increased Mineral Resources the Company anticipates a significant improvement to expected project life and overall project economics.
Expanded Mineral Resource
During the quarter, Piedmont announced a major update to the Mineral Resource estimate (MRE) for the Project located within the world-class Carolina Tin-Spodumene Belt (TSB) in North Carolina, USA (Table 1). 
The MRE for the Core property has increased to 25.1 million tonnes (Mt) at a grade of 1.09% Li2O, bringing the Projects total MRE to 27.9 Mt at a grade of 1.11% Li2O, containing 309,000 tonnes of lithium oxide (Li2O) or 764,000 tonnes of lithium carbonate equivalent (LCE) (the benchmark used in the lithium industry). 
Table 1: Project Wide Mineral Resource Estimate for the
 Piedmont Lithium Project (0.4%
 cut-off)
ResourcCore propertyCentral      Total
e                    property
 Catego
ry
TonnesGrade TonnesGrade TonnesGrade Li2O  LCE
 (Mt)  (Li   (Mt)  (Li   (Mt)  (Li  (t)   (t)
      2O%)        2O%)        2O%)
Indicat12.5  1.13  1.41  1.38  13.9  1.16  161,00398,00
ed                                         0     0
Inferre12.6  1.04  1.39  1.29  14.0  1.06  148,00366,00
d                                          0     0
Total  25.1  1.09  2.80  1.34  27.9  1.11  309,00764,00
                                           0     0
The MRE was prepared by independent consultants, CSA Global Pty Ltd (CSA Global) in accordance with the JORC Code (2012 Edition).
Approximately 50%, or 12.5 Mt of the Mineral Resource is classified in the Indicated Resource category. All of the Mineral Resource tonnes at both Core and Central properties are attributable to spodumene mineralization.
An important feature of the Core MRE, is that 74% or 18.6 Mt is located within 100 meters of surface. Table 2 shows the details of the MRE with regards to depth from surface.
Table 2: Depth from Surface for the Core Mineral Resource
 Estimate (25.1Mt (at) 1.09%
 Li
2O) 
Depth (from Tonnes (Mt) Percentage  Cumulative  Cumulative
 surface)                of          Tonnes      % of
 (m)                     Resource    (Mt)        Resource
                         (%)
0 - 50      8.7         35          8.7         35
50 - 100    9.9         39          18.6        74
100 - 150   5.7         23          24.3        97
150 +       0.8         3           25.1        100
In April 2019 the Company announced an initial MRE on its Central property of 2.8 Mt at 1.34% Li2O. Approximately 50%, or 1.41 million tonnes, of the MRE is classified in the Indicated Resource category (Table 1). The Mineral Resource estimate was prepared by CSA in accordance with JORC Code (2012 Edition).
The reported Central MRE is based on 18 diamond core holes totaling 2,840 meters. The Central deposit is open in all directions. The Central Property is located approximately 1 mile south of the Core Property (Figure 2). 
In addition to the updated MRE, new Exploration Targets have been estimated by CSA Global within the Core and Central properties. Table 3 summarizes the Exploration Target potential of the Piedmont Lithium Project.
Table 3: Project Wide Exploration Target for the
 Piedmont Lithium
 Project
ExploratioCore Property  Central        Total
n                         Property
 Target
Tonnes Grade  Tonnes Grade  Tonnes Grade
 (Mt)   (Li    (Mt)   (Li    (Mt)   (Li
       2O%)          2O%)          2O%)
Exploratio4.0-4.51.0-1.22.0-2.51.1-1.36.0-7.01.0-1.3
n
 Target*
*The potential quantity and grade of the Exploration
 Targets is conceptual in nature. There has been
 insufficient exploration to estimate a Mineral
 Resource and it is uncertain if further exploration
 will result in the estimation of a Mineral
 Resource.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.002.jpeg
Figure 2: Piedmont Lithium Project Showing Resource, Resource Shells and New Exploration Target Areas
Phase 4 Drilling Program
To date, 94 exploration holes have been completed totaling 15,737.7 meters as part of the Companys 25,000-meter Phase 4 drill program at the Project. Table 4 below outlines the details for the Phase 4 program.
Table 4: Phase 4 Drill Program Details
Property    Holes         Meters       Holes -
             Completed     Completed    Reported
Core        79            13,396.9     78
Central     15            2,340.8      15
Total       94            15,737.7     93
Separately, the Company has drilled 7 sterilization holes totaling 925m on the proposed concentrator and waste rock stockpile sites. Assays are pending for those 7 holes.
Mineralogy Analysis
During the quarter, Piedmont completed mineralogical analysis on samples of mineralized pegmatites and composite samples from Piedmonts Core, Central, and Sunnyside Properties. All testwork to date effectively demonstrates that lithium occurs almost exclusively within spodumene in Piedmonts mineral resource.
Table 5: Average XRD Analysis Results from 46 Drill Core
 and Composite Samples of Piedmont
 Ore
Mineralogy       Average Wt. (%) of Mineral Types
Core Property            Central   Sunnysid
                          Property e
                                    Propert
                                   y
Semi-quaQuantitaCompositQuantitatiQuantita
ntitativtive    e       ve        tive
e        Samples Variabi Samples   Sample
 Samples        lity
        (19      Samples(3        (1
(13      Samples         Samples)  Sample)
 Samples)       (10
)                Samples
                )
LithiSpodumene   17.8    19.9    16.6    15.9      14.8
um-be
aring
 mine
rals
Petalite    -       -       -       -         -
Lepidolite  -       -       -       -         -
Zinnwaldite -       -       -       -         -
Holmquistite-       -       0.5     -         -
Non-lithium      82.2    80.1    82.9    84.1      85.2
 bearing
 minerals
Total            100.0   100.0   100.0   100.0     100.0
Piedmont has been advised that the relatively pure spodumene character of its ore body is unusual and highly positive, allowing for a simplified flowsheet to produce strong lithium recoveries. Certain hard rock lithium projects are understood to contain multiple lithium-bearing minerals (petalite, lepidolite, zinnwaldite, etc. as well as spodumene).
The Company completed mineralogical testing, comprising semi-quantitative and quantitative x-ray diffraction (XRD) analysis. 36 samples of mineralized pegmatites were collected from Piedmonts Core, Central, and Sunnyside Properties. The average results of these samples are shown in Table 5 above.
Additionally, Piedmont completed semi-quantitative XRD on 10 variability samples from the Core property from composites of core collected during Phase 2 and Phase 3 drill campaigns. These samples were created to simulate a run-of-mine concentrator feed sample in terms of average grade and composition including a distribution of samples across early, middle and late years production. A total mass of 839 kg was collected for these samples. The average XRD results of the variability samples are shown in Table 5 above.
The data show that the Piedmont ore body does not contain any petalite, lepidolite, or zinnwaldite. These non-spodumene lithium bearing minerals concentrate under different operating conditions than spodumene when processing with dense medium or flotation. Additionally, petalite (4.86% Li2O) and lepidolite (7.70% Li2O) have lower lithium content than spodumene (8.03%).
Therefore, Piedmont expects to maintain both high lithium concentrate grades and recoveries at the Companys planned concentrator in part due to the absence of petalite or other lithium bearing minerals.
Metallurgical Test Work
Subsequent to the end of the quarter, Piedmont announced positive results from pre-feasibility study (PFS) level metallurgical test work conducted on composite samples of ore from the Project performed at SGS testing laboratories in Lakefield, Ontario.
Dense Medium Separation (DMS) and flotation Locked-Cycle Tests (LCT) test work results showed high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from composite samples. Piedmont test results compare favorably in several quality categories with the reported shipments of three emerging Australian spodumene producers.
Table 6: Results of Dense Medium Separation + Locked Cycle
 Flotation Test Results (Composite Sample
 1)
Sample            Feed ConcentrFe2O3Na2O K2O  CaO+ P2O5 
                   Gradate      (%)  (%)  (%)  MgO (%)
                  e     Grade                  + 
                   Li   Li                    MnO
                  2O   2O (%)                  (%)
                   (%)
Piedmont          1.11 6.35    0.93 0.63 0.49 0.96 0.32
 Composite Sample
 1
Australian        NR   6.00    1.20 NR   NR   NR   NR
 Producer
 1
Australian        NR   5.90    1.50 NR   NR   NR   NR
 Producer
 2
Australian        NR   6.10    0.61 0.80 0.76 0.79 0.30
 Producer
 3
NR: Not Reported
The composite samples were prepared to approximate the average grade of the Projects ore body. Overall lithium recovery during testwork for the preferred flowsheet was 77% at a grade of 6.35% Li2O. Simulations based on the testwork results support an overall plant design recovery of 85% when targeting a 6.0% Li2O spodumene concentrate product. Further optimization will be undertaken in a future feasibility level pilot testwork program.
The Companys forthcoming Scoping Study update will incorporate the updated flow sheet developed during this test work program. The benefit of incorporating DMS technology into the flow sheet will be reduced operating costs and accelerated ramp-up.
Figure 3 shows photographs of the coarse and fine DMS concentrates produced using the preferred process flow diagram. Piedmont spodumene concentrate is generally light green to white colored.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.003.jpeg
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.004.png
Figure 3. Coarse and fine final DMS concentrates produced from Piedmont composite samples
Based on the results of composite DMS and locked cycle flotation testwork the preferred process flow block diagram for the Project is shown in Figure 4.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.005.jpeg
Figure 4. Potential concentrator block diagram showing dense medium and flotation circuits
Technical Studies
During the quarter, the Company substantially completed engineering work for the upcoming updated Scoping Study to integrate updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs. The Scoping Study update is expected to be completed within the next 2 weeks.
Marshall Miller has substantially completed mine design, sitewide civil design, and waste rock stockpile planning for the Project to support permitting activities and the upcoming Scoping Study update. Primero Group has substantially completed design engineering to a PFS-level of accuracy for the upcoming Scoping Study update. 
Corporate
Placement
Subsequent to the end of the quarter, on July 10, 2019, the Company successfully completed an institutional placement of 145 million shares at an issue price of A$0.145 per share to institutional investors to raise gross proceeds of A$21 million (Placement).
The Placement was led by cornerstone investor, Fidelity International (Fidelity), a global asset manager, and the Companys largest shareholder, AustralianSuper, the largest industry super fund in Australia. The remaining Placement shares were issued to a number of high-quality Australian and Asian institutions, including some existing shareholders and others new to the Piedmont story.
Proceeds from the Placement will be used to complete a DFS and provide funding for the Company to continue development of the Project.
Strategic Discussions
Piedmont has been engaged in numerous preliminary off-take, financing and strategic conversations over the past several months. Interested parties are of a global nature, and include companies from the lithium, mining, chemicals, battery, automotive and private equity sectors. Piedmont expects to appoint financial and legal advisors in the second half of 2019 to assist in the evaluation of strategic and financing options, but we do not plan to report on such matters until there is more clarity on the ultimate outcome.
Exploration Interests
As at June 30, 2019, the Company owns or has entered into exclusive option agreements or land acquisition agreements with local landowners, which upon exercise, allow the Company to purchase (or in some cases long-term lease) approximately 2,207 acres of surface property and the associated mineral rights from the private landowners. During the quarter, the Company entered into exclusive option agreements and/or land acquisition agreements with local landowners for an additional approximately 102 acres of surface property and the associated mineral rights from the private landowners.
Forward Looking Statements
This announcement may include forward-looking statements. These forward-looking statements are based on the Companys expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of the Company, which could cause actual results to differ materially from such statements. The Company makes no undertaking to subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or events after the date of that announcement.
Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources
The Projects Core Property Mineral Resource of 25.1Mt (at) 1.13% Li2O comprises Indicated Mineral Resources of 12.5Mt (at) 1.13% Li2O and Inferred Mineral Resources of 12.6Mt (at) 1.04% Li2O. The Central Property Mineral Resource of 2.80Mt (at) 1.34% Li2O comprises Indicated Mineral Resources of 1.41Mt (at) 1.38% Li2O and 1.39Mt (at) 1.29% Li2O.
The information contained in this announcement has been prepared in accordance with the requirements of the securities laws in effect in Australia, which differ from the requirements of U.S. securities laws. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are Australian terms defined in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). However, these terms are not defined in Industry Guide 7 ("SEC Industry Guide 7") under the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act"), and are normally not permitted to be used in reports and filings with the U.S. Securities and Exchange Commission (SEC). Accordingly, information contained herein that describes Piedmonts mineral deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder. U.S. investors are urged to consider closely the disclosure in Piedmonts Form 20-F, a copy of which may be obtained from Piedmont or from the EDGAR system on the SECs website at http://www.sec.gov/.
Competent Persons Statements
The information in this presentation that relates to Exploration Results is extracted from the Companys ASX announcements dated March 14, 2019, February 13, 2019, October 17, 2018, August 23, 2018, July 19, 2018, June 14, 2018, June 7, 2018, May 17, 2018, May 10, 2018, April 9, 2018, 4 April 2018, 15 March 2018, 1 December 2017, 2 November 2017, 27 September 2017, 23 May 2017, 3 April 2017, and 18 October 2016 which are available to view on the Companys website at www.piedmontlithium.com. 
The information in this presentation that relates to Exploration Targets and Mineral Resources is extracted from the Companys ASX announcements dated June 25, 2019, June 14, 2018 and April 24, 2019 which are available to view on the Companys website at www.piedmontlithium.com. 
The information in this presentation that relates to Metallurgical Testwork Results is extracted from the Companys ASX announcements dated September 4, 2018 and July 17, 2018 which are available to view on the Companys website at www.piedmontlithium.com. 
The information in this presentation that relates to Process Design, Process Plant Capital Costs, and Process Plant Operating Costs is extracted from the Companys ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Companys website at www.piedmontlithium.com.
The information in this presentation that relates to Mining Engineering and Mine Schedule is extracted from the Companys ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Companys website at www.piedmontlithium.com. 
Piedmont confirms that: a) it is not aware of any new information or data that materially affects the information included in the original ASX announcements; b) all material assumptions and technical parameters underpinning Mineral Resources, Exploration Targets, Production Targets, and related forecast financial information derived from Production Targets included in the original ASX announcements continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons findings are presented in this report have not been materially modified from the original ASX announcements.
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Piedmont Lithium Limited
ABN                          Quarter ended (current
                              quarter)
50 002 664 495               June 30, 2019
Consolidated statement of cash Current     Year to
 flows                          quarter     date
                                            
                               US$000
                                           (12 months)
                                           US$000
1. Cash flows from operating   -           -
    activities
1.1Receipts from customers
1.2Payments for                (1,445)     (5,017)
   (a)-exploration & evaluation
   (b)-development             -           -
   (c)-production              -           -
   (d)-staff costs             (507)       (2,408)
   (e)-administration and      (115)       (954)
    corporate
    costs
1.3Dividends received (see note-           -
    
   3)
1.4Interest received           30          126
1.5Interest and other costs of -           -
    finance
    paid
1.6Income taxes paid           -           -
1.7Research and development    -           -
    refunds
1.8Other (provide details if   (291)       (1,206)
    material):
   (a) -business development &
    investor
    relations
1.9Net cash from / (used in)   (2,328)     (9,459)
    operating
    activities
2.  Cash flows from investing  -           -
     activities
2.1 Payments to acquire:
    (a)-property, plant and
     equipment
    (b)-tenements (see item 10)(343)       (1,527)
    (c)-investments            -           -
    (d)-other non-current      -           -
     assets
2.2 Proceeds from the disposal
     of:                       -           -
    (a)-property, plant and
     equipment
    (b)-tenements (see item 10)-           -
    (c)-investments            -           -
    (d)-other non-current      -           -
     assets
2.3 Cash flows from loans to   -           -
     other
     entities
2.4 Dividends received (see    -           -
     note
     3)
2.5 Other (provide details if  -           -
     material)
2.6 Net cash from / (used in)  (343)       (1,527)
     investing
     activities
3.  Cash flows from financing  -           8,773
     activities
3.1 Proceeds from issues of
     shares
3.2 Proceeds from issue of     -           -
     convertible
     notes
3.3 Proceeds from exercise of  -           -
     share
     options
3.4 Transaction costs related  (11)        (509)
     to issues of shares,
     convertible notes or
     options
3.5 Proceeds from borrowings   -           -
3.6 Repayment of borrowings    -           -
3.7 Transaction costs related  -           -
     to loans and
     borrowings
3.8 Dividends paid             -           -
3.9 Other (provide details if  -           -
     material)
3.10Net cash from / (used in)  (11)        8,264
     financing
     activities
4.  Net increase / (decrease)  7,129       7,238
     in cash and cash
     equivalents for the
     period
4.1 Cash and cash equivalents
     at beginning of
     period
4.2 Net cash from / (used in)  (2,328)     (9,459)
     operating activities
     (item
     1.9 above)
4.3 Net cash from / (used in)  (343)       (1,527)
     investing activities
     (item
     2.6 above)
4.4 Net cash from / (used in)  (11)        8,264
     financing activities
     (item
     3.10 above)
4.5 Effect of movement in      (15)        (84)
     exchange rates on cash
     held
4.6 Cash and cash equivalents  4,432       4,432
     at end of
     period
5.  Reconciliation of cash   Current      Previous
     and cash                 quarter      quarter
     equivalents
                             US$000       US$000
    at the end of the
     quarter (as shown in
     the consolidated
     statement of cash
     flows) to the related
     items in the
     accounts
5.1 Bank balances            1,955        1,852
5.2 Call deposits            2,477        5,278
5.3 Bank overdrafts          -            -
5.4 Other (provide details)  -            -
5.5 Cash and cash            4,432        7,129
     equivalents at end of
     quarter (should equal
     item
     4.6 above)
6.  Payments to directors of the entity   Current
     and their                             quarter
     associates
                                          US$000
6.1 Aggregate amount of payments to these (135)
     parties included in
     item
     1.2
6.2 Aggregate amount of cash flow from    -
     loans to these parties included in
     item
     2.3
6.3 Include below any explanation necessary to
     understand the transactions included in
     items
     6.1 and 6.2
Payments include directors fees, superannuation,
 executive remuneration, company secretarial services
 and provision of a fully serviced
 office.
7.  Payments to related entities of the   Current
     entity and their                      quarter
     associates
                                          US$000
7.1 Aggregate amount of payments to these -
     parties included in
     item
     1.2
7.2 Aggregate amount of cash flow from    -
     loans to these parties included in
     item
     2.3
7.3 Include below any explanation necessary to
     understand the transactions included in
     items
     7.1 and 7.2
Not applicable.
8.  Financing facilities     Total        Amount drawn
     available                facility     at quarter
                              amount at    end
    Add notes as necessary    quarter
     for an understanding of  end         US$000
     the
     position                US$000
8.1 Loan facilities          -            -
8.2 Credit standby           -            -
     arrangements
8.3 Other (please specify)   -            -
8.4 Include below a description of each facility above,
     including the lender, interest rate and whether it
     is secured or unsecured. If any additional
     facilities have been entered into or are proposed
     to be entered into after quarter end, include
     details of those facilities as
     well.
Not applicable.
9.  Estimated cash outflows for    US$000
     next
     quarter
9.1 Exploration and evaluation     (1,600)
9.2 Development                    -
9.3 Production                     -
9.4 Staff costs                    (900)
9.5 Administration and corporate   (800)
     costs
9.6 Other (provide details if      -
     material)
9.7 Total estimated cash outflows  (3,300)
10. Changes in  Tenement Nature of   InterestInterest
     tenements   referenc interest    at      at end
                e and                 beginni of
    (items       location            ng of    quarter
     2.1(b) and                       quarter
     2.2(b)
     above)
10.1Interests   -        -           -       -
     in mining
     tenements
     and
     petroleum
     tenements
     lapsed,
     relinquishe
    d or
     reduced
10.2Interests   Piedmont Freehold    100%    100% 
     in mining   Lithium  land       (2,105 a(2,207 a
     tenements   Project  and/or     cres)   cres)
     and         located  o
     petroleum   in      ptions to
     tenements   North    purchase
     acquired    Carolina or lease
     or         ,         surface
     increased            property
                USA       and
                          associated
                          mineral
                          rights
                          from
                          private
                          landowners
Compliance statement
1-This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
2-This statement gives a true and fair view of the matters disclosed.
Sign here: 
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.006.png
............................................................--
(Director/Company secretary)
Print name: Gregory Swan
Date: July 30, 2019
Notes
1.-The quarterly report provides a basis for informing the market how the entitys activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
2.-If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.-Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
      
 
   
   
   " alt="EnWave Receives Deposit from Consulting Fresh Business S.L. for Large-Scale Radiant Energy Vacuum Equipment
" alt="EnWave Receives Deposit from Consulting Fresh Business S.L. for Large-Scale Radiant Energy Vacuum Equipment">
 " alt="Starcore Reports Year End 2019 Results
" alt="Starcore Reports Year End 2019 Results">
Datum: 30.07.2019 - 13:56 Uhr
Sprache: Deutsch
News-ID 1551094
Anzahl Zeichen: 35098
contact information:
Contact person:
Town:
Wien
Phone:
Kategorie:
Business News
Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:
Diese Pressemitteilung wurde bisher 538 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Piedmont Lithium Limited: Juni 2019 Quarterly Report
"
steht unter der journalistisch-redaktionellen Verantwortung von
Piedmont Lithium Limited (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).