Piedmont Lithium Limited (ASX: PLL; NASDAQ: PLL) (Piedmont or Company) is pleased to present its June 2019 quarterly report. Highlights during and subsequent to the quarter were:

- Increased total Mineral Resources for the Piedmont Lithium Project (Project) by 72% to 27.9 million tonnes (Mt) at a grade of 1.11% Li2O following:
- an updated Mineral Resource estimate for the Companys Core property, increasing the Core property Mineral Resources to 25.1 Mt at a grade of 1.09% Li2O; and
- an initial Mineral Resource estimate for the Companys Central property, located approximately one mile south of the Core property, of 2.8 Mt at a grade of 1.34% Li2O.
- Completed mineralogical analysis on samples of mineralized pegmatites and composite samples from the Project demonstrating that lithium occurs almost exclusively within spodumene in the Projects ore body.
- Completed PFS-level metallurgical test work demonstrating high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from representative bulk samples using a combination of Dense Medium Separation (DMS) and flotation technology.
- Continued the 25,000-meter Phase 4 drill program, where a total of 94 holes have been completed to date for a total of 15,738 meters.
- Substantially completed engineering for the planned Scoping Study update to integrate updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs.
- Continued numerous preliminary off-take, financing and strategic conversations, including companies from the lithium, mining, chemicals, battery, automotive and private equity sectors.
- After quarter end, on July 10th, Piedmont completed an institutional placement of 145 million shares at A$0.145 per share to raise gross proceeds of A$21 million, led by cornerstone investor, Fidelity International (Fidelity) and the Companys largest shareholder, AustralianSuper.





Next steps:

- Complete an updated Scoping Study based on updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs.
- Continue Phase 4 drilling and expansion of the Companys land position in the Carolina Tin-Spodumene Belt (TSB) with a focus on areas of high mineral prospectivity.
- Complete permit applications and secure the necessary permits and approvals to commence mining and processing operations at the Project.
- Advance development of the Companys proposed lithium hydroxide chemical plant including metallurgical testwork for the conversion of spodumene concentrate produced from Piedmont ore.

For further information, contact:

Keith D. Phillips ---
President & CEO ---
T: +1 973 809 0505 ---
E: keith(at)piedmontlithium.com -

Anastasios (Taso) Arima
Executive Director
T: +1 347 899 1522
E: taso(at)piedmontlithium.com

Project Overview

Piedmont Lithium Limited (ASX: PLL; Nasdaq: PLL) holds a 100% interest in the Piedmont Lithium Project (Project) located within the TSB and along trend to the Hallman Beam and Kings Mountain mines, which historically provided most of the western worlds lithium between the 1950s and the 1980s. The TSB has been described as one of the largest lithium regions in the world and is located approximately 25 miles west of Charlotte, North Carolina.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.001.jpeg


Figure 1: Piedmont Lithium Project located within the TSB

In September 2018 the Company published a Scoping Study for an integrated lithium hydroxide business, which featured a 13-year project life, NPV8 of US$888 million, a US$3,112 per tonne lithium hydroxide operating cost, and a US$193 per tonne spodumene concentrate operating cost.

The Company expects to publish an updated Scoping Study within the next 2 weeks based on the expanded Mineral Resource estimate of 27.9 Mt grading at 1.11% Li2O. As a result of the increased Mineral Resources the Company anticipates a significant improvement to expected project life and overall project economics.

Expanded Mineral Resource

During the quarter, Piedmont announced a major update to the Mineral Resource estimate (MRE) for the Project located within the world-class Carolina Tin-Spodumene Belt (TSB) in North Carolina, USA (Table 1).

The MRE for the Core property has increased to 25.1 million tonnes (Mt) at a grade of 1.09% Li2O, bringing the Projects total MRE to 27.9 Mt at a grade of 1.11% Li2O, containing 309,000 tonnes of lithium oxide (Li2O) or 764,000 tonnes of lithium carbonate equivalent (LCE) (the benchmark used in the lithium industry).

Table 1: Project Wide Mineral Resource Estimate for the
Piedmont Lithium Project (0.4%
cut-off)

ResourcCore propertyCentral Total
e property
Catego
ry

TonnesGrade TonnesGrade TonnesGrade Li2O LCE
(Mt) (Li (Mt) (Li (Mt) (Li (t) (t)
2O%) 2O%) 2O%)
Indicat12.5 1.13 1.41 1.38 13.9 1.16 161,00398,00
ed 0 0

Inferre12.6 1.04 1.39 1.29 14.0 1.06 148,00366,00
d 0 0

Total 25.1 1.09 2.80 1.34 27.9 1.11 309,00764,00
0 0

The MRE was prepared by independent consultants, CSA Global Pty Ltd (CSA Global) in accordance with the JORC Code (2012 Edition).

Approximately 50%, or 12.5 Mt of the Mineral Resource is classified in the Indicated Resource category. All of the Mineral Resource tonnes at both Core and Central properties are attributable to spodumene mineralization.

An important feature of the Core MRE, is that 74% or 18.6 Mt is located within 100 meters of surface. Table 2 shows the details of the MRE with regards to depth from surface.

Table 2: Depth from Surface for the Core Mineral Resource
Estimate (25.1Mt (at) 1.09%
Li
2O)
Depth (from Tonnes (Mt) Percentage Cumulative Cumulative
surface) of Tonnes % of
(m) Resource (Mt) Resource
(%)

0 - 50 8.7 35 8.7 35
50 - 100 9.9 39 18.6 74
100 - 150 5.7 23 24.3 97
150 + 0.8 3 25.1 100

In April 2019 the Company announced an initial MRE on its Central property of 2.8 Mt at 1.34% Li2O. Approximately 50%, or 1.41 million tonnes, of the MRE is classified in the Indicated Resource category (Table 1). The Mineral Resource estimate was prepared by CSA in accordance with JORC Code (2012 Edition).

The reported Central MRE is based on 18 diamond core holes totaling 2,840 meters. The Central deposit is open in all directions. The Central Property is located approximately 1 mile south of the Core Property (Figure 2).

In addition to the updated MRE, new Exploration Targets have been estimated by CSA Global within the Core and Central properties. Table 3 summarizes the Exploration Target potential of the Piedmont Lithium Project.

Table 3: Project Wide Exploration Target for the
Piedmont Lithium
Project

ExploratioCore Property Central Total
n Property
Target

Tonnes Grade Tonnes Grade Tonnes Grade
(Mt) (Li (Mt) (Li (Mt) (Li
2O%) 2O%) 2O%)
Exploratio4.0-4.51.0-1.22.0-2.51.1-1.36.0-7.01.0-1.3
n
Target*

*The potential quantity and grade of the Exploration
Targets is conceptual in nature. There has been
insufficient exploration to estimate a Mineral
Resource and it is uncertain if further exploration
will result in the estimation of a Mineral
Resource.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.002.jpeg


Figure 2: Piedmont Lithium Project Showing Resource, Resource Shells and New Exploration Target Areas

Phase 4 Drilling Program

To date, 94 exploration holes have been completed totaling 15,737.7 meters as part of the Companys 25,000-meter Phase 4 drill program at the Project. Table 4 below outlines the details for the Phase 4 program.

Table 4: Phase 4 Drill Program Details
Property Holes Meters Holes -
Completed Completed Reported

Core 79 13,396.9 78
Central 15 2,340.8 15
Total 94 15,737.7 93

Separately, the Company has drilled 7 sterilization holes totaling 925m on the proposed concentrator and waste rock stockpile sites. Assays are pending for those 7 holes.

Mineralogy Analysis

During the quarter, Piedmont completed mineralogical analysis on samples of mineralized pegmatites and composite samples from Piedmonts Core, Central, and Sunnyside Properties. All testwork to date effectively demonstrates that lithium occurs almost exclusively within spodumene in Piedmonts mineral resource.

Table 5: Average XRD Analysis Results from 46 Drill Core
and Composite Samples of Piedmont
Ore

Mineralogy Average Wt. (%) of Mineral Types
Core Property Central Sunnysid
Property e
Propert
y

Semi-quaQuantitaCompositQuantitatiQuantita
ntitativtive e ve tive
e Samples Variabi Samples Sample
Samples lity
(19 Samples(3 (1
(13 Samples Samples) Sample)
Samples) (10
) Samples
)

LithiSpodumene 17.8 19.9 16.6 15.9 14.8
um-be
aring
mine
rals

Petalite - - - - -
Lepidolite - - - - -
Zinnwaldite - - - - -
Holmquistite- - 0.5 - -
Non-lithium 82.2 80.1 82.9 84.1 85.2
bearing
minerals

Total 100.0 100.0 100.0 100.0 100.0

Piedmont has been advised that the relatively pure spodumene character of its ore body is unusual and highly positive, allowing for a simplified flowsheet to produce strong lithium recoveries. Certain hard rock lithium projects are understood to contain multiple lithium-bearing minerals (petalite, lepidolite, zinnwaldite, etc. as well as spodumene).

The Company completed mineralogical testing, comprising semi-quantitative and quantitative x-ray diffraction (XRD) analysis. 36 samples of mineralized pegmatites were collected from Piedmonts Core, Central, and Sunnyside Properties. The average results of these samples are shown in Table 5 above.

Additionally, Piedmont completed semi-quantitative XRD on 10 variability samples from the Core property from composites of core collected during Phase 2 and Phase 3 drill campaigns. These samples were created to simulate a run-of-mine concentrator feed sample in terms of average grade and composition including a distribution of samples across early, middle and late years production. A total mass of 839 kg was collected for these samples. The average XRD results of the variability samples are shown in Table 5 above.

The data show that the Piedmont ore body does not contain any petalite, lepidolite, or zinnwaldite. These non-spodumene lithium bearing minerals concentrate under different operating conditions than spodumene when processing with dense medium or flotation. Additionally, petalite (4.86% Li2O) and lepidolite (7.70% Li2O) have lower lithium content than spodumene (8.03%).

Therefore, Piedmont expects to maintain both high lithium concentrate grades and recoveries at the Companys planned concentrator in part due to the absence of petalite or other lithium bearing minerals.

Metallurgical Test Work

Subsequent to the end of the quarter, Piedmont announced positive results from pre-feasibility study (PFS) level metallurgical test work conducted on composite samples of ore from the Project performed at SGS testing laboratories in Lakefield, Ontario.

Dense Medium Separation (DMS) and flotation Locked-Cycle Tests (LCT) test work results showed high quality spodumene concentrate product with a grade above 6.0% Li2O, iron oxide below 1.0%, and low impurities from composite samples. Piedmont test results compare favorably in several quality categories with the reported shipments of three emerging Australian spodumene producers.

Table 6: Results of Dense Medium Separation + Locked Cycle
Flotation Test Results (Composite Sample
1)

Sample Feed ConcentrFe2O3Na2O K2O CaO+ P2O5
Gradate (%) (%) (%) MgO (%)
e Grade +
Li Li MnO
2O 2O (%) (%)
(%)

Piedmont 1.11 6.35 0.93 0.63 0.49 0.96 0.32
Composite Sample
1

Australian NR 6.00 1.20 NR NR NR NR
Producer
1

Australian NR 5.90 1.50 NR NR NR NR
Producer
2

Australian NR 6.10 0.61 0.80 0.76 0.79 0.30
Producer
3
NR: Not Reported

The composite samples were prepared to approximate the average grade of the Projects ore body. Overall lithium recovery during testwork for the preferred flowsheet was 77% at a grade of 6.35% Li2O. Simulations based on the testwork results support an overall plant design recovery of 85% when targeting a 6.0% Li2O spodumene concentrate product. Further optimization will be undertaken in a future feasibility level pilot testwork program.

The Companys forthcoming Scoping Study update will incorporate the updated flow sheet developed during this test work program. The benefit of incorporating DMS technology into the flow sheet will be reduced operating costs and accelerated ramp-up.

Figure 3 shows photographs of the coarse and fine DMS concentrates produced using the preferred process flow diagram. Piedmont spodumene concentrate is generally light green to white colored.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.003.jpeg

https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.004.png


Figure 3. Coarse and fine final DMS concentrates produced from Piedmont composite samples

Based on the results of composite DMS and locked cycle flotation testwork the preferred process flow block diagram for the Project is shown in Figure 4.
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.005.jpeg

Figure 4. Potential concentrator block diagram showing dense medium and flotation circuits

Technical Studies

During the quarter, the Company substantially completed engineering work for the upcoming updated Scoping Study to integrate updated Mineral Resources, latest metallurgical testwork, flowsheet optimization and updated costs. The Scoping Study update is expected to be completed within the next 2 weeks.

Marshall Miller has substantially completed mine design, sitewide civil design, and waste rock stockpile planning for the Project to support permitting activities and the upcoming Scoping Study update. Primero Group has substantially completed design engineering to a PFS-level of accuracy for the upcoming Scoping Study update.

Corporate

Placement

Subsequent to the end of the quarter, on July 10, 2019, the Company successfully completed an institutional placement of 145 million shares at an issue price of A$0.145 per share to institutional investors to raise gross proceeds of A$21 million (Placement).

The Placement was led by cornerstone investor, Fidelity International (Fidelity), a global asset manager, and the Companys largest shareholder, AustralianSuper, the largest industry super fund in Australia. The remaining Placement shares were issued to a number of high-quality Australian and Asian institutions, including some existing shareholders and others new to the Piedmont story.

Proceeds from the Placement will be used to complete a DFS and provide funding for the Company to continue development of the Project.

Strategic Discussions

Piedmont has been engaged in numerous preliminary off-take, financing and strategic conversations over the past several months. Interested parties are of a global nature, and include companies from the lithium, mining, chemicals, battery, automotive and private equity sectors. Piedmont expects to appoint financial and legal advisors in the second half of 2019 to assist in the evaluation of strategic and financing options, but we do not plan to report on such matters until there is more clarity on the ultimate outcome.

Exploration Interests

As at June 30, 2019, the Company owns or has entered into exclusive option agreements or land acquisition agreements with local landowners, which upon exercise, allow the Company to purchase (or in some cases long-term lease) approximately 2,207 acres of surface property and the associated mineral rights from the private landowners. During the quarter, the Company entered into exclusive option agreements and/or land acquisition agreements with local landowners for an additional approximately 102 acres of surface property and the associated mineral rights from the private landowners.

Forward Looking Statements

This announcement may include forward-looking statements. These forward-looking statements are based on the Companys expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of the Company, which could cause actual results to differ materially from such statements. The Company makes no undertaking to subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or events after the date of that announcement.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources

The Projects Core Property Mineral Resource of 25.1Mt (at) 1.13% Li2O comprises Indicated Mineral Resources of 12.5Mt (at) 1.13% Li2O and Inferred Mineral Resources of 12.6Mt (at) 1.04% Li2O. The Central Property Mineral Resource of 2.80Mt (at) 1.34% Li2O comprises Indicated Mineral Resources of 1.41Mt (at) 1.38% Li2O and 1.39Mt (at) 1.29% Li2O.

The information contained in this announcement has been prepared in accordance with the requirements of the securities laws in effect in Australia, which differ from the requirements of U.S. securities laws. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are Australian terms defined in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). However, these terms are not defined in Industry Guide 7 ("SEC Industry Guide 7") under the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act"), and are normally not permitted to be used in reports and filings with the U.S. Securities and Exchange Commission (SEC). Accordingly, information contained herein that describes Piedmonts mineral deposits may not be comparable to similar information made public by U.S. companies subject to reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder. U.S. investors are urged to consider closely the disclosure in Piedmonts Form 20-F, a copy of which may be obtained from Piedmont or from the EDGAR system on the SECs website at http://www.sec.gov/.

Competent Persons Statements

The information in this presentation that relates to Exploration Results is extracted from the Companys ASX announcements dated March 14, 2019, February 13, 2019, October 17, 2018, August 23, 2018, July 19, 2018, June 14, 2018, June 7, 2018, May 17, 2018, May 10, 2018, April 9, 2018, 4 April 2018, 15 March 2018, 1 December 2017, 2 November 2017, 27 September 2017, 23 May 2017, 3 April 2017, and 18 October 2016 which are available to view on the Companys website at www.piedmontlithium.com.
The information in this presentation that relates to Exploration Targets and Mineral Resources is extracted from the Companys ASX announcements dated June 25, 2019, June 14, 2018 and April 24, 2019 which are available to view on the Companys website at www.piedmontlithium.com.

The information in this presentation that relates to Metallurgical Testwork Results is extracted from the Companys ASX announcements dated September 4, 2018 and July 17, 2018 which are available to view on the Companys website at www.piedmontlithium.com.

The information in this presentation that relates to Process Design, Process Plant Capital Costs, and Process Plant Operating Costs is extracted from the Companys ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Companys website at www.piedmontlithium.com.

The information in this presentation that relates to Mining Engineering and Mine Schedule is extracted from the Companys ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Companys website at www.piedmontlithium.com.

Piedmont confirms that: a) it is not aware of any new information or data that materially affects the information included in the original ASX announcements; b) all material assumptions and technical parameters underpinning Mineral Resources, Exploration Targets, Production Targets, and related forecast financial information derived from Production Targets included in the original ASX announcements continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons findings are presented in this report have not been materially modified from the original ASX announcements.


+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity
Piedmont Lithium Limited
ABN Quarter ended (current
quarter)

50 002 664 495 June 30, 2019

Consolidated statement of cash Current Year to
flows quarter date

US$000
(12 months)
US$000
1. Cash flows from operating - -
activities

1.1Receipts from customers
1.2Payments for (1,445) (5,017)
(a)-exploration & evaluation
(b)-development - -
(c)-production - -
(d)-staff costs (507) (2,408)
(e)-administration and (115) (954)
corporate
costs

1.3Dividends received (see note- -

3)
1.4Interest received 30 126
1.5Interest and other costs of - -
finance
paid

1.6Income taxes paid - -
1.7Research and development - -
refunds

1.8Other (provide details if (291) (1,206)
material):

(a) -business development &
investor
relations

1.9Net cash from / (used in) (2,328) (9,459)
operating
activities


2. Cash flows from investing - -
activities

2.1 Payments to acquire:
(a)-property, plant and
equipment

(b)-tenements (see item 10)(343) (1,527)
(c)-investments - -
(d)-other non-current - -
assets

2.2 Proceeds from the disposal
of: - -

(a)-property, plant and
equipment

(b)-tenements (see item 10)- -
(c)-investments - -
(d)-other non-current - -
assets

2.3 Cash flows from loans to - -
other
entities

2.4 Dividends received (see - -
note
3)
2.5 Other (provide details if - -
material)

2.6 Net cash from / (used in) (343) (1,527)
investing
activities


3. Cash flows from financing - 8,773
activities

3.1 Proceeds from issues of
shares

3.2 Proceeds from issue of - -
convertible
notes

3.3 Proceeds from exercise of - -
share
options

3.4 Transaction costs related (11) (509)
to issues of shares,
convertible notes or
options

3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related - -
to loans and
borrowings

3.8 Dividends paid - -
3.9 Other (provide details if - -
material)

3.10Net cash from / (used in) (11) 8,264
financing
activities


4. Net increase / (decrease) 7,129 7,238
in cash and cash
equivalents for the
period

4.1 Cash and cash equivalents
at beginning of
period

4.2 Net cash from / (used in) (2,328) (9,459)
operating activities
(item
1.9 above)
4.3 Net cash from / (used in) (343) (1,527)
investing activities
(item
2.6 above)
4.4 Net cash from / (used in) (11) 8,264
financing activities
(item
3.10 above)
4.5 Effect of movement in (15) (84)
exchange rates on cash
held

4.6 Cash and cash equivalents 4,432 4,432
at end of
period

5. Reconciliation of cash Current Previous
and cash quarter quarter
equivalents
US$000 US$000
at the end of the
quarter (as shown in
the consolidated
statement of cash
flows) to the related
items in the
accounts

5.1 Bank balances 1,955 1,852
5.2 Call deposits 2,477 5,278
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash 4,432 7,129
equivalents at end of
quarter (should equal
item
4.6 above)

6. Payments to directors of the entity Current
and their quarter
associates
US$000
6.1 Aggregate amount of payments to these (135)
parties included in
item
1.2
6.2 Aggregate amount of cash flow from -
loans to these parties included in
item
2.3
6.3 Include below any explanation necessary to
understand the transactions included in
items
6.1 and 6.2
Payments include directors fees, superannuation,
executive remuneration, company secretarial services
and provision of a fully serviced
office.

7. Payments to related entities of the Current
entity and their quarter
associates
US$000
7.1 Aggregate amount of payments to these -
parties included in
item
1.2
7.2 Aggregate amount of cash flow from -
loans to these parties included in
item
2.3
7.3 Include below any explanation necessary to
understand the transactions included in
items
7.1 and 7.2
Not applicable.

8. Financing facilities Total Amount drawn
available facility at quarter
amount at end
Add notes as necessary quarter
for an understanding of end US$000
the
position US$000

8.1 Loan facilities - -
8.2 Credit standby - -
arrangements

8.3 Other (please specify) - -
8.4 Include below a description of each facility above,
including the lender, interest rate and whether it
is secured or unsecured. If any additional
facilities have been entered into or are proposed
to be entered into after quarter end, include
details of those facilities as
well.

Not applicable.

9. Estimated cash outflows for US$000
next
quarter

9.1 Exploration and evaluation (1,600)
9.2 Development -
9.3 Production -
9.4 Staff costs (900)
9.5 Administration and corporate (800)
costs

9.6 Other (provide details if -
material)

9.7 Total estimated cash outflows (3,300)

10. Changes in Tenement Nature of InterestInterest
tenements referenc interest at at end
e and beginni of
(items location ng of quarter
2.1(b) and quarter
2.2(b)
above)

10.1Interests - - - -
in mining
tenements
and
petroleum
tenements
lapsed,
relinquishe
d or
reduced

10.2Interests Piedmont Freehold 100% 100%
in mining Lithium land (2,105 a(2,207 a
tenements Project and/or cres) cres)
and located o
petroleum in ptions to
tenements North purchase
acquired Carolina or lease
or , surface
increased property
USA and
associated
mineral
rights
from
private
landowners

Compliance statement
1-This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.
2-This statement gives a true and fair view of the matters disclosed.


Sign here:
https://www.irw-press.at/prcom/images/messages/2019/48452/190630 - Quarterly Report_Jun2019_PLL_FINALPRcom.006.png

............................................................--
(Director/Company secretary)
Print name: Gregory Swan
Date: July 30, 2019

Notes
1.-The quarterly report provides a basis for informing the market how the entitys activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.
2.-If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.-Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:



Leseranfragen:





PresseKontakt / Agentur:



Bereitgestellt von Benutzer: irw
Datum: 30.07.2019 - 13:56 Uhr
Sprache: Deutsch
News-ID 1551094
Anzahl Zeichen: 35098

contact information:
Contact person:
Town:

Wien


Phone:

Kategorie:

Business News


Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:


Diese Pressemitteilung wurde bisher 535 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Piedmont Lithium Limited: Juni 2019 Quarterly Report

"
steht unter der journalistisch-redaktionellen Verantwortung von

Piedmont Lithium Limited (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Piedmont Lithium Limited



 

Who is online

All members: 10 568
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 85


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.