Revival Gold Announces Additional Drill Results at Beartrack; Receives Permits to Commence Drilling at Arnett

ID: 1541686
recent pressrelease next pressrelease

(PresseBox) - Revival Gold Inc. (TSXV: RVG, OTCQB: RVLGF) (?Revival Gold? or the "Company" - http://www.commodity-tv.net/c/search_adv/?v=298437), a growth-focused gold exploration and development company, announces results from four additional holes from its 8,000-meter core drilling program at the former producing Beartrack Gold Project (?Beartrack?) located in Lemhi County, Idaho. In addition, Revival Gold has received permits to commence drilling at the neighbouring Arnett Gold Project (?Arnett?).

Highlights

Ongoing drill program continues to intersect gold mineralization beyond the limits of the current Mineral Resource in three target areas at Beartrack

Drill hole BT18-214D in the Ward?s Gulch area returned24 g/t Au over 23.3 meters, 1.74 g/t Au over 22.5 meters and 1.80 g/t Au over 19.9 meters1

Drill hole BT18-211D in the Joss area returned 66 g/t Au over 13.9 meters, 2.16 g/t Au over 15.2 meters, 1.16 g/t Au over 21.3 meters and 1.67 g/t Au over 27.1 meters1

Permits received to allow an initial seven-hole 1,000-meter core drilling program at Arnett. Drilling is expected to commence with a third rig on the Beartrack-Arnett project area in early October.

1 Drilled width; true width estimates are presented in the table below.

?Revival Gold continues to intersect significant gold mineralization beyond the limits of the current Mineral Resource at Beartrack including at Joss, the South Pit and at Ward?s Gulch?, said Hugh Agro, President & CEO. ?Drilling will continue with two rigs on the ongoing program at Beartrack. In addition, we are permitted and expect to add a third drill rig in a new target area (Haidee) at Arnett shortly?.

Details

On May 29th, 2018, Revival released a maiden NI 43-101 mineral resource estimate for the Beartrack property (?Mineral Resource?).

On September 5th, 2018, Revival released results from the first three holes (BT18-207D, BT18-208D and BT18-209D) of its planned 2018 8,000-meter resource expansion core drilling program at Beartrack. These holes were targeted to expand the current open pit-constrained Mineral Resource below, and on strike from, the South Pit area. The holes returned significant widths and grades of mineralization.



The four drill holes released today (BT18-210D, BT18-211D, BT18-212D and BT18-214D) were targeted to expand the current open pit-constrained Mineral Resource below, and on strike from, the North Pit and Ward?s Gulch areas as well as in the Joss area where there is currently no Mineral Resource.

Holes BT18-214D and BT18-211D successfully extended mineralization at depth in the Ward?s Gulch area and encountered several significant mineralized intervals in the Joss area. Holes BT18-210D and BT18-212D intercepted only modest widths of mineralization below the current open pit-constrained Mineral Resource in the North Pit area.

Mineralization at Beartrack remains open to the south of Joss, north along strike between Joss and the South Pit, north along strike between the South Pit and Ward?s Gulch area and into the North Pit.

To date in 2018, eleven core holes have been completed at Beartrack for a total of approximately 5,300 meters.d Joss areas.

Summary assay results from holes released today are presented in the table below:

Drilling will continue at Beartrack through the fall season with all results expected to be released by early 2019.

Arnett Permitting and 2018 Drilling Plans

In October 2017 Revival Gold submitted a Plan of Operations permit application to the United States Forest Service to drill from 52 drill-pad locations on the Company?s unpatented claims at Arnett. A public comment period was completed in February 2018. Permitting is progressing and a permit for drilling on Revival Gold?s unpatented claims at Arnett is expected to be received by year end.

On Revival Gold?s recently acquired patented claim at Arnett (see press release dated July 24th, 2018), the Company applied for and has now received all state and federal permits, required to begin a seven-hole 1,000-meter core drill program on patented ground.

This year?s drilling program at Arnett will target known mineralization at the Haidee prospect and will be integrated with 11 core holes previously drilled by Meridian Gold Inc. in 1997.

QA/QC Program

Quality Assurance/Quality Control consists of the regular insertion of duplicates, blanks and certified reference materials into the sample stream.

Gold assays are determined by Fire Assay and AAS on a 30-gram nominal sample weight (Au-AA25).

Steven T. Priesmeyer, C.P.G., Vice-President Exploration, Revival Gold Inc., is the Company''s designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved its scientific and technical content.

About Revival Gold Inc.

Revival Gold Inc. is a growth-focused gold exploration and development company. The Company has the right to acquire a 100% interest in Meridian Beartrack Co., owner of the former producing Beartrack Gold Project located in Lemhi County, Idaho. Revival also owns rights to a 100% interest in the neighbouring Arnett Gold Project.

In addition to its interests in Beartrack and Arnett, the Company is pursuing other gold exploration and development opportunities and holds a 51% interest in the Diamond Mountain Phosphate Project located in Uintah County, Utah.

Revival Gold has approximately 42 million shares outstanding and had a cash balance of approximately $4.7 million as at June 30th, 2018. Additional disclosure of the Company?s financial statements, technical reports, material change reports, news releases and other information can be obtained at www.revival-gold.com or on SEDAR at www.sedar.com.

For further information, please visit www.revival-gold.com or contact:

Andrea Totino, Investor Relations Manager

Telephone: (416) 366-4100

Email: info(at)revival-gold.com

In Europe:

Swiss Resource Capital AG

Jochen Staiger

info(at)resource-capital.ch

www.resource-capital.ch

Cautionary Statement

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company?s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as ?believes?, ?anticipates?, ?expects?, ?estimates?, ?may?, ?could?, ?would?, ?will?, or ?plan?. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management?s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company?s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital, operating and reclamation costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company?s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.



More information:
http://https:// https://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:



PressContact / Agency:



published by: PresseBox
print pressrelease  send to a friend  

Date: 09/26/2018 - 07:14
Language: English
News-ID 1541686
Character count: 2107
Kontakt-Informationen:
Firma: Swiss Resource Capital AG
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Toronto, ON
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 388

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 430
Register today: 1
Register yesterday: 0
Members online: 0
Guests online: 42


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.