Zinc One Reports Drill Results from Mina Grande Centro, Bongará Zinc Mine Project, Peru
31.8 Metres of 28.2% Zinc and 18.0 Metres of 26.2% Zinc
(PresseBox) - Zinc One Resources Inc. (TSX-V: Z; OTC Markets: ZZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? - http://www.commodity-tv.net/c/search_adv/?v=298394) is pleased to announce the results from 29 of the 64 holes drilled in the Mina Grande Centro zone, Bongar
Jim Walchuck, President and CEO of Zinc One commented, ?The Mina Grande Centro drill program successfully confirmed the near-surface zinc mineralization that was left behind by previous mining activity and clearly showed that additional high-grade mineralization has yet to be delineated to the northeast.
Mina Grande Centro Drill Results Highlights:
Significant new intercepts include:
[list]
MGC18012 ? 31.8 metres of 28.2% zinc, from 18.0 metres drill depth
[list]
True vertical thickness of 22.5 metres from true vertical depth of 12.7 metres
MGC18008 ? 15.0 metres of 28.9% zinc, from surface
True vertical thickness of 15.0 metres
MGC18023 ? 18.0 metres of 26.2% zinc, from 13.5 metres drill depth
True vertical thickness of 12.7 metres from true vertical depth of 9.5 metres
Mineralization at Mina Grande Centro includes zinc oxides, carbonates and silicates hosted by soils, highly-weathered carbonates, and fine- to coarse-grained dolomites, most of which are brecciated.
[/list]
[/list]
Mina Grande Centro is a part of the Mina Grande zone, one of the three zones of high-grade, near-surface zinc-oxide mineralization along a 1.4 kilometre mineralized trend that was tested by this drill program consisting of 264 holes for 7,930 metres. Drill results at Mina Grande Norte and the remaining drill holes at Mina Grande Centro will be released in the coming weeks.
Geology and Discussion of Results
The zinc mineralization at the Bongar
The results from drill holes MGC18001 through 029 at Mina Grande Centro can be found below in Table 1.www.zincone.com.
Sampling and Analytical Protocols
Zinc One follows a systematic and rigorous Quality Control/Quality Assurance program overseen by Dr. Bill Williams, COO and Director of Zinc One.
The sample from each core run is placed in a 60-centimetre long, plastic core box that has five columns.<2 metres, are chosen. Each core box is photographed and then sampled with a spatula, if soil or heavily-weathered rock, or cut with a core saw, 50% of which is placed in a sample bag and stored on site in a secure location. The Company independently inserts certified control standards, blanks, and duplicates, all of which comprise at least 20% of the sample batch, to monitor sample preparation and analytical quality.
Qualified Person
The technical content of this news release has been reviewed, verified and approved by Dr. Bill Williams, COO and Director of Zinc One, a qualified person as defined by NI 43-101.
About Zinc One Resources Inc.
Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions. included >20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte Bongar
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Themen in dieser Pressemitteilung:
Unternehmensinformation / Kurzprofil:
Datum: 11.09.2018 - 05:07 Uhr
Sprache: Deutsch
News-ID 1540988
Anzahl Zeichen: 3383
contact information:
Contact person:
Town:
Vancouver, BC
Phone:
Kategorie:
Internet
Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:
Diese Pressemitteilung wurde bisher 585 mal aufgerufen.
Die Pressemitteilung mit dem Titel:
"Zinc One Reports Drill Results from Mina Grande Centro, Bongará Zinc Mine Project, Peru
"
steht unter der journalistisch-redaktionellen Verantwortung von
Swiss Resource Capital AG (Nachricht senden)
Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).