businesspress24.com - Acrow Bridge Works with WSDOT on Emergency Project Replacing Overpass on Interstate 5
 

Acrow Bridge Works with WSDOT on Emergency Project Replacing Overpass on Interstate 5

ID: 1464393

Temporary bridge put in place only 13 days after structure was damaged by a semi-trailer with an oversize load

(firmenpresse) - PARSIPPANY, NJ -- (Marketwired) -- 10/18/16 -- Less than two weeks after an oversized load seriously damaged a heavily traveled overpass over Interstate 5 in Chehalis, WA, traffic was restored through the installation of a modular bridge supplied by , a leading international bridge engineering and supply company.

The 50-foot-long temporary bridge was ordered after an accident involving a southbound semi-trailer truck carrying two excavators. The oversize load seriously damaged all six girders supporting the bridge deck, according to Washington State Department of Transportation. WSDOT immediately ordered the span to be closed and taken down in one night, with a plan for expedited installation of Acrow''s temporary bridge.

"It was critical to local business and residents to restore traffic flow for nearly 15,000 daily vehicles which traverse the Chamber Way overpass" said Jack Arizcuren, Acrow''s Regional Sales Manager - Pacific States. "Acrow worked closely with WSDOT and Atkinson Construction work a viable solution, then safely execute installation, and opening of the roadway."

Added Bill Killeen, President and CEO of Acrow Bridge, "DOTs and contractors consistently turn to Acrow for quick turnarounds that minimize delay and facilitate on-time and ahead-of-time outcomes to complicated projects."

Acrow sold the materials used in the Chehalis project to WSDOT, which the state will keep it as an asset for future use. Acrow also supplied temporary bridging to WSDOT during the construction of a four-lane,160-foot-long replacement span on one side of the on I-5 in Mount Vernon, WA in May 2013 after it was hit by a semi-trailer carrying an oversize load and collapsed.

Acrow Bridge has been serving the transportation and construction industries for more than 60 years with a full line of modular steel bridging solutions for vehicle, rail, vessel, military and pedestrian use. Acrow''s extensive international presence includes its leadership in the development and implementation of bridge infrastructure projects in over 80 countries, covering Africa, Asia, the Americas, Europe and the Middle East. For more information, please visit .







Contact:
Tracy Van Buskirk
Marketcom PR
Main: (212) 537-5177, ext. 8
Mobile: (203) 246-6165

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:



Leseranfragen:



PresseKontakt / Agentur:



drucken  als PDF  an Freund senden  Parcel Pending Predicts That 1.5 Billion Packages Will Be Delivered Between Black Friday and Christmas Eve
Chromcraft Revington Douglas Issues Statement Regarding Unauthorized Manufacture and Distribution of Chair Designs
Bereitgestellt von Benutzer: Marketwired
Datum: 18.10.2016 - 08:38 Uhr
Sprache: Deutsch
News-ID 1464393
Anzahl Zeichen: 4286

contact information:
Contact person:
Town:

PARSIPPANY, NJ


Phone:

Kategorie:

Construction


Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:


Diese Pressemitteilung wurde bisher 425 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Acrow Bridge Works with WSDOT on Emergency Project Replacing Overpass on Interstate 5
"
steht unter der journalistisch-redaktionellen Verantwortung von

Acrow Bridge (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Acrow Bridge



 

Who is online

All members: 10 563
Register today: 2
Register yesterday: 2
Members online: 0
Guests online: 105


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.