businesspress24.com - Pan Orient Announces June 30, 2016 Contingent Bitumen Resources for Sawn Lake, Alberta Project of An
 

Pan Orient Announces June 30, 2016 Contingent Bitumen Resources for Sawn Lake, Alberta Project of Andora Energy Corporation

ID: 1460197

(firmenpresse) - CALGARY, ALBERTA -- (Marketwired) -- 09/26/16 -- Pan Orient Energy Corp. (TSX VENTURE: POE), on behalf of its 71.8% owned subsidiary Andora Energy Corporation ("Andora"), is pleased to release the June 30, 2016 Contingent Resources Report which is a National Instrument 51-101 compliant resources evaluation for Andora''s oil sands interests at Sawn Lake Alberta, Canada, as evaluated by Sproule Unconventional Limited ("Sproule"). The evaluation included all of Andora''s Oil Sands Leases at Sawn Lake based on exploitation using Steam Assisted Gravity Drainage ("SAGD").

The evaluation at June 30, 2016 incorporates the final results of the Sawn Lake demonstration project which produced bitumen from September 2014 to February 2016 from one SAGD wellpair. The demonstration project established the viability of the SAGD process in the Bluesky formation at Sawn Lake and provided information on productive capability and instantaneous steam-oil ratio of the reservoir.

Highlights of Sawn Lake, Alberta Contingent Resources Report as at June 30, 2016

Summary

Sawn Lake SAGD Development

Andora is focused on developing the bitumen resources at the Sawn Lake property in the Peace River Oil Sands Region using SAGD development. The first step towards determining the commercial viability of the SAGD recovery process at Sawn Lake was the demonstration project. The demonstration project has proven that the SAGD process works in the Bluesky formation at Sawn Lake, established characteristics of ramp up through stabilization of SAGD performance, indicated the productive capability, ISOR, and provided critical information required for well and facility design associated with future commercial development. The final results of the demonstration project have been used to update the reservoir model and prepare the June 30, 2016 Contingent Resources Report. Production results to date are not necessarily indicative of long-term performance or of ultimate recovery and the Sawn Lake demonstration project has not yet proven that it is commercially viable.





Andora is the operator and holds a 50% working interest in the Central Block of Sawn Lake, where the demonstration project facility and wellpair are located. An application for a potential expansion at the demonstration project site to 3,200 BOPD was submitted at the end of April 2016. It is expected that a reactivation of the demonstration project facility and wellpair would be considered as part of a potential commercial expansion to 3,200 BOPD. The expansion application requests the drilling of up to seven additional SAGD wellpairs which are tied into the existing demonstration project facility. The facility would be expanded to generate the additional necessary steam, and it is anticipated that additional steam generation would include the test installation of Andora''s proprietary produced water boiler. Andora believes that its produced water boiler could achieve significant benefits for Sawn Lake SAGD field development. Regulatory approval is expected to take approximately a year and a half. An expansion is dependent on regulatory approval, completion of detailed engineering and a higher commodity price environment to support project economics and financing.

Pan Orient is a Calgary, Alberta based oil and gas exploration and production company with operations currently located onshore Thailand, Indonesia and in Western Canada.

This news release contains forward-looking information. Forward-looking information is generally identifiable by the terminology used, such as "expect", "believe", "estimate", "should", "anticipate" and "potential" or other similar wording. Forward-looking information in this news release includes, but is not limited to, references to: well drilling programs and drilling plans, estimates of potentially recoverable resources, and information on future production and project start-ups. By their very nature, the forward-looking statements contained in this news release require Pan Orient and its management to make assumptions that may not materialize or that may not be accurate. The forward-looking information contained in this news release is subject to known and unknown risks and uncertainties and other factors, which could cause actual results, expectations, achievements or performance to differ materially, including without limitation: imprecision of resources estimates and estimates of recoverable quantities of bitumen, obtaining and timing of regulatory approvals, changes in project schedules, operating and reservoir performance, the effects of weather and climate change, the results of exploration and development drilling and related activities, demand for oil and gas, commercial negotiations, other technical and economic factors or revisions and other factors, many of which are beyond the control of Pan Orient. Although Pan Orient believes that the expectations reflected in its forward-looking statements are reasonable, it can give no assurances that the expectations of any forward-looking statements will prove to be correct.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.



Contacts:
Pan Orient Energy Corp.
Jeff Chisholm
President and CEO (located in Bangkok, Thailand)


Pan Orient Energy Corp.
Bill Ostlund
Vice President Finance and CFO
(403) 294-1770

Weitere Infos zu dieser Pressemeldung:

Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:



Leseranfragen:



PresseKontakt / Agentur:



drucken  als PDF  an Freund senden  Junex''s Applies for a New Production Lease on its Galt Oil Property
Drilling of the Lateral Section of Bourque has Begun
Bereitgestellt von Benutzer: Marketwired
Datum: 26.09.2016 - 06:30 Uhr
Sprache: Deutsch
News-ID 1460197
Anzahl Zeichen: 2871

contact information:
Contact person:
Town:

CALGARY, ALBERTA


Phone:

Kategorie:

Oil & Gas


Typ of Press Release:
type of sending:
Date of sending:
Anmerkungen:


Diese Pressemitteilung wurde bisher 94 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Pan Orient Announces June 30, 2016 Contingent Bitumen Resources for Sawn Lake, Alberta Project of Andora Energy Corporation
"
steht unter der journalistisch-redaktionellen Verantwortung von

Pan Orient Energy Corp. (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Pan Orient Energy Corp.



 

Who is online

All members: 10 565
Register today: 0
Register yesterday: 0
Members online: 1
Guests online: 92


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.