businesspress24.com - Riverstone Reports 28.61 g/t Au over 20 Metres on Yaramoko Gold Project, Burkina Faso, West Africa
 

Riverstone Reports 28.61 g/t Au over 20 Metres on Yaramoko Gold Project, Burkina Faso, West Africa

ID: 1022772

(firmenpresse) - Riverstone Reports 28.61 g/t Au over 20 Metres on Yaramoko Gold Project, Burkina Faso, West Africa

April 8, 2011 Symbols: TSXV – RVS; Frankfurt – 3RV

VANCOUVER, BC (April 08, 2011) Riverstone Resources Inc. (“the company” TSX-V: RVS) is pleased to report the final series assays from its Yaramoko gold concession in western Burkina Faso, West Africa. Assays include data from 19 of the 33 reverse circulation holes (1,468 out of 2,723 metres) drilled in December 2010 and January 2011 (YRM-10-RC023 through YRM-11-RC055) of which 17 targeted Bagassi South mineralization, 7 Bagassi Central targets and 9 Bagassi North targets.

Riverstone entered into an agreement to option a 60% interest in the property to Roxgold Inc. (“Roxgold”) in July 2010. Under the terms of the agreement, Roxgold is to incur exploration expenditures of $1.5 million, issue 360,000 shares and make payments totalling $100,000 to earn a 60% interest in the property. The term of the agreement is three years and Riverstone will be the operator for the initial work programs on the property.

NEW GOLD DISCOVERY IN ”BAGASSI CENTRAL”

Drill holes YMR-10-RC035 through YMR-10-RC039 and 048 and 055have been completed in the Bagassi Central discovery. While additional drilling is needed to better understand the mineralized structure, drill holeYMR-10-RC055, which was collared approximately 80 metresnorth west of YMR-10-RC036 intersected two zones of significant mineralization including 20 metres of 28.61 GPT and 11 metres grading 4.88 GPT. Significant results fromthe Bagassi Central drilling are as follows:

Please follow the link to view the entire news including tables:
http://www.irw-press.com/dokumente/RVS_NR080411_ENGLISH.pdf


YRM-10-RC037 through YRM-10-RC039 were step outs of 350 metres to 650 metres from YRM-10-RC036 and only intersected weakly anomalous mineralization. YRM-10-RC048 was collared in the general area of YRM-10-RC036, but drilled at an azmith of 360o.





YRM-10-RC036 encountering intensely silicified and pyritized intrusive rocks below the surface anomaly and the hole was lost at a depth of 90 metres. YRM-10-RC055 intersected similar silicified and pyritized intrusive rocks from 16 to 22 metres. As noted in the February 28, 2011 news release, this zone yielded abundant visible gold when the tailings material was panned. Approximately 16 metres down hole a second intercept was encountered in YMR-10-RC055, just prior to the end of the hole at 49 metres.It is believed that YRM-10-RC036 was lost prior to the expected intersection of this second zone intersected in YMR-10-RC055. A program of metallics assays and cyanide leaching is underway to confirm the high grade tenor of the mineralization encountered.

While YRM-10-RC036 and YRM-10-RC055 were collared approximately 80 metres apart, given Hole YRM-10-RC036 was drilled at an azmith of 220o while YRM-10-RC055 was drilled at an azmith of 180o the actual distance between the two intercepts would be less than 80 metres.

RAB drilling is expected to commence shortly to better define the soil geochemistry as extensive artisanal workings in the area have caused surface disturbance precluding the use of standard soil geochemistry techniques. Once this information is available the Bagassi Central discovery will be the focus of additional drilling during Phase 2 work at Yaramoko in the upcoming months, pending drill rig availability

BAGASSI NORTH DRILLING

An additional nine holes were completed at the Bagassi North target which lies approximately one kilometres north-north west of the Bagassi Central discovery. Results are as follows:

Please follow the link to view the entire news including tables:
http://www.irw-press.com/dokumente/RVS_NR080411_ENGLISH.pdf


QUALITY ASSURANCE/QUALITY CONTROL

Riverstone Resources Inc. is the operator of the current program and maintains a quality control program involving the use of repeat assays, inserted blanks and the use of certified standards from an accredited Canadian laboratory. All Yaramoko samples were assayed using standard fire assay with atomic absorption techniques, with samples grading over one gram gold per tonne re-assayed with a gravimetric finish, at the independent Abilab Burkina SARL laboratories in Ouagadougou, Burkina Faso, which is part of the ALS Chemex group.

In addition to the normal gold assaying procedures for each drill sample submitted, all 2 metre drill samples from Yaramoko in which visible gold was noted after panning (approximately 40), were assayed for gold using a 2 kg sample and cyanide leaching and these results are pending. A high level of exploration and development activity in the gold sector in Burkina Faso has resulted in an increase in the turnaround time for receiving all gold assays.

Riverstone Resources Inc. is active in gold exploration in Burkina Faso, West Africa, where the company holds an extensive portfolio of six high quality exploration projects covering 2,300 square kilometres. The Goulagou permit is subject to an option to purchase agreement with Golden Star Resources. For further information about the company and its activities, please refer to the company’s website at www.riverstoneresources.com and under the Company’s profile at www.sedar.com.

ON BEHALF OF THE BOARD
“Michael D. McInnis”
______________________________________
Michael D. McInnis, P. Eng., President & CEO

For further information contact:
Vancouver Office:
Michael D. McInnis, President 604-801-5020Raju Wani, Investor Relations 403-240-0555
Email: info(at)riverstoneresources.com Ron Cooper, Investor Relations 604-986-0112


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Paul Anderson, P.Geo.is a Qualified Person for RVS and has reviewed and approved the contents of this release.

Certain statements made and information contained in this news release and elsewhere constitutes “forward-looking information” within the meaning of the Ontario Securities Act. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to the interpretation of drill results and the estimation of mineral resources, the geology, grade and continuity of mineral deposits, the possibility that future exploration, development results will not be consistent with the Company’s expectations, accidents, equipment breakdowns, title matters and surface access, labour disputes, the potential for delays in exploration activities, the potential for unexpected costs and expenses, commodity price fluctuations, currency fluctuations, failure to obtain adequate financing on a timely basis and other risks and uncertainties, including those described under Risk Factors in each management discussion and analysis. In addition, forward-looking information is based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of gold, that the Company will receive required permits and access to surface rights, that the Company can access financing, appropriate equipment and sufficient labour and that the political environment within Burkina Faso will continue to support the development of environmentally safe mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements.


Themen in dieser Pressemitteilung:


Unternehmensinformation / Kurzprofil:



Leseranfragen:

Riverstone Resources

1125 - 595 Howe Street
Vancouver, BC
Canada V6C 2T5



PresseKontakt / Agentur:



Bereitgestellt von Benutzer: irw
Datum: 08.04.2011 - 10:18 Uhr
Sprache: Deutsch
News-ID 1022772
Anzahl Zeichen: 0

contact information:
Contact person:
Town:

Wien


Phone:

Kategorie:

Business News


Anmerkungen:


Diese Pressemitteilung wurde bisher 203 mal aufgerufen.


Die Pressemitteilung mit dem Titel:
"Riverstone Reports 28.61 g/t Au over 20 Metres on Yaramoko Gold Project, Burkina Faso, West Africa

"
steht unter der journalistisch-redaktionellen Verantwortung von

Riverstone Resources (Nachricht senden)

Beachten Sie bitte die weiteren Informationen zum Haftungsauschluß (gemäß TMG - TeleMedianGesetz) und dem Datenschutz (gemäß der DSGVO).


Alle Meldungen von Riverstone Resources



 

Who is online

All members: 10 591
Register today: 0
Register yesterday: 1
Members online: 0
Guests online: 83


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.